This is Platform 6 at Preston.
This is Platform 6 at Preston.
The platform extension for 11 car Pendolinos was done first, then resurfacing of rest of platform, nearest to camera.
With coper edge & height specified within tolerances of less than 25mm (relative to track) how can the joint between contracts end up like this!
Also note:
Also note:
- Channel drains not joined-up;
- Platform 6 extension longer than Platform 5 but other end of Platform there is no difference;
- Expensive type of paving slabs used - Wigan North Western and Warrington done with paviours (bricks) which take ages to lay and are hell to lift & relay if required. Down south they use quick, cheap, and easy tarmac (Wimbledon and Winchester for example);
- The main resurfacing contract clearly has some other problems still to resolve:- around column bases, and over the subway - which as an afterthought now has to be partially reconstructed to achieve the desired levels!