This from the Scotsman...
Plans to close Breich Station in West Lothian, used by just three passengers a week, have been announced by Network Rail.
The move has been prompted by the £1.4 million cost of replacing its footbridge as part of electrification of the line, which would be saved.
It is understood the station is likely to have stayed open otherwise.
The Sparks Effect, indeed!
Just imagine how many more of those annoying station things we could close if NR electrified the entire network!
UPDATE: This from Captain Deltic...
If the clever traction engineers at Derby can fit an aluminium tube with seats and air conditioning and braking equipment and doors and bogies and lots of clever electronics and charge £1.2 million a throw for an Aventra vehicle how on earth can civil engineers justify £1.4 million for a footbridge?
And does that include leaning-on-a-shovel-looking time?