Showing posts with label Crap civils. Show all posts
Showing posts with label Crap civils. Show all posts

Friday, 28 September 2012

Preston showcases 'joined up railway'

This from Old BR Engineer...

This is Platform 6 at Preston. 


The platform extension for 11 car Pendolinos was done first, then resurfacing of rest of platform, nearest to camera. 


With coper edge & height specified within tolerances of less than 25mm (relative to track) how can the joint between contracts end up like this!

Also note:
  • Channel drains not joined-up;
  • Platform 6 extension longer than Platform 5 but other end of Platform there is no difference;
  • Expensive type of paving slabs used - Wigan North Western and Warrington done with paviours (bricks) which take ages to lay and are hell to lift & relay if required.  Down south they use quick, cheap, and easy tarmac (Wimbledon and Winchester for example);
  • The main resurfacing contract clearly has some other problems still to resolve:- around column bases, and over the subway - which as an afterthought now has to be partially reconstructed to achieve the desired levels!
Oh Dear!