Thursday, 23 July 2009

Electrification - a plea

Dear Lord Adonis

Thank you for the promise to electrify various bits of the network.

Would it be possible to avoid the mistakes of the past and not do it on the cheap?

To stop this sort of thing happening:

(LNE) At 0858 OLE sections 34 & 36 on the Down Slow and Down Fast lines at Biggleswade tripped with the driver of 1N03, HB, 0830 London Kings Cross - Newcastle Central, in section on the Down Fast line reporting a loss of line light, with the driver requested to examine the pantograph. The traction current on the Down Slow line was reset at 0909. A Mobile Operations Manager and OLE staff were sent to site. The line was examined by 1P12, EG, 0822 London Kings Cross - Peterborough, with the driver reporting a dropper below the contact wire on the Down Fast line near Tempsford CCTV LC. All Down direction services were diverted to the Down Slow line with service reduction implemented. At 1025 staff on site reporting being unable to find anything foul of the contact wire. 1N03 was authorised to go forward, after the pantograph was confirmed as undamaged, and was instructed to examine the OLE for the remainder of the section. NWR at 1041 after 1N03 had completed the examination with nothing amiss found.
TRUST 269559 IQGU = 2 part cancelled = 61 trains = 818 mins.
Fault No.331607. CCIL 455997.

Many thanks.

Yours sincerely
The Fact Compiler